[All] URGENT: Communiqué / Press release: pipeline Enbridge 9B
Louisette Lanteigne
butterflybluelu at rogers.com
Fri Nov 20 11:26:51 EST 2015
Enbridge has submitted the results of its detailed engineering for Line 9 leak detection system to the NEB. Expected leak sensitivity performance data demonstrates that the leak detection system to be used would take two hours to detect a leak that corresponds to 2% of the nominal flow. Based on an expected volume of 300 000 barrels a day, the performance data means that the system will not detect a leak below 500 barrels over a period of two hours.
Media release included in the attachments in English and French with further details.
This information came to be by way of Citoyens au Courant.
Please circulate this WIDELY!
Louisette Lanteigne700 Star Flower Ave.Waterloo ONN2V 2L2
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://gren.ca/pipermail/all_gren.ca/attachments/20151120/aab9d6d9/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: patrouillescdpnov2015fr.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 34156 bytes
Desc: not available
URL: <http://gren.ca/pipermail/all_gren.ca/attachments/20151120/aab9d6d9/attachment.docx>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Press release-CaC-foot-patrol.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 40925 bytes
Desc: not available
URL: <http://gren.ca/pipermail/all_gren.ca/attachments/20151120/aab9d6d9/attachment-0001.docx>
More information about the All
mailing list